Fall
2003 Work
Click on any picture for a larger version!
Perry Harrell and Cheryl Munson augering Priority 2 samples on
the east end of the site.
The last sample on the east side is ready to be cleaned. Jocelyn Turner
made sure each of the auger sample locations was set up with a zip-lock
plastic sample bag and a record form labeled with the assigned FS number
and grid coordinates. Record forms were kept in a second zip-lock bag
until excavators, profilers, and screeners had completed their parts of
the form.
On the last day of work on the north edge of the site,
we were able to finish all the Priority 3 samples.
In
the final two days of the survey with 12 people working we were incredibly
productive: set out grid locations for 23 samples, augured 50, cleaned
50, profiled 50, and screened 50!!!